Free Buyer's Resource
Section 32 Buyer's Checklist (Victoria)
32 points to check on every Section 32 Vendor's Statement before you sign a Contract of Sale. Print this, take it to the property, and tick off each item with your conveyancer or solicitor.
1. Title and ownership
- ☐Vendor on title matches the seller. Section 32(2)(a). Common issue: deceased estates, family trusts, mid-divorce sales.
- ☐Title is unencumbered or all mortgages/charges to be discharged at settlement are listed.
- ☐Caveats checked. Any caveat lodged against the title? Section 32(2)(c).
- ☐Folio/title plan included. Confirms boundaries match what you walked.
2. Easements, restrictions and covenants
- ☐All easements disclosed. Drainage, sewer, telecommunications, council access. Section 32(2)(d).
- ☐Easement plans match the title plan. Cross-check geographically — easements through your future garage are common.
- ☐Restrictive covenants read in full. Any "single dwelling only", height caps, materials restrictions, no-fence obligations?
- ☐Section 173 Agreements. These bind future owners. Common: short-stay restrictions, build-by deadlines, fencing, vegetation retention.
3. Planning controls and overlays
- ☐Planning property report from council included or available.
- ☐All overlays identified — HO (Heritage), BMO (Bushfire), DDO (Design and Development), SLO (Significant Landscape), VPO (Vegetation Protection), ESO (Environmental Significance), LSIO (Land Subject to Inundation), FO (Floodway), EAO (Environmental Audit), EMO (Erosion Management).
- ☐BAL rating disclosed if BMO applies. BAL-12.5/19/29/40/FZ — affects construction cost and insurance.
- ☐Heritage citation read if HO applies. What's protected? What can/can't you change?
- ☐EAO requires Statement of Environmental Audit (s53Y) before residential use. Critical for former-industrial / mining / petrol-station sites.
4. Building permits and works
- ☐Building permits last 7 years disclosed. Section 32(2)(b).
- ☐Owner-builder warranty if any work was done as owner-builder in last 7 years.
- ☐Final occupancy permit issued for any major work? If not, council may not have signed off.
- ☐No illegal works. Compare what you see (deck, garage, granny flat) to what's on the permit history.
5. Owners Corporation (if applicable)
- ☐Owners Corporation Certificate (s151) included.
- ☐Quarterly fees disclosed and you can afford them long-term.
- ☐Sinking fund balance not zero or negative. Low sinking fund = special-levy risk.
- ☐Recent or upcoming special levies. Often tens of thousands per lot.
- ☐OC rules read — short-stay, pets, parking, balcony alterations. Some OCs ban Airbnb entirely.
6. Outgoings and rates
- ☐Council rates current and projected.
- ☐Water rates (incl. trade waste / storm-water charges).
- ☐State Land Tax if investment / second home (post Vacant Residential Land Tax expansion).
- ☐Windfall Gains Tax (WGT) — applies to land that has been rezoned. Look for any WGT notice on title.
- ☐GAIC (Growth Areas Infrastructure Contribution) if in UGZ greenfield. Typically $13k–$15k per dwelling lot. Verify with State Revenue Office.
7. Notices and orders
- ☐No outstanding notices — building, planning, environmental, fire-safety. Section 32(2)(b)(i).
- ☐No road-widening notice.
- ☐No council compliance order requiring works.
8. Independent checks before signing
- ☐Building inspection by an independent builder/inspector.
- ☐Pest inspection (often combined with building).
- ☐Council planning property report.
- ☐Insurance quote — particularly for BMO, LSIO, FO, EMO properties.
- ☐Solicitor or conveyancer review — non-negotiable. This checklist supports your conveyancer; it does not replace them.
Want an automated first-pass review?
Upload your Section 32 PDF and get a plain-English risk report in minutes — covering the same 32 points above plus suburb-specific considerations.
Upload my Section 32 — $19© Pre Contract Review · This checklist is general information and does not constitute legal advice. Always engage a solicitor or conveyancer before signing.